OSHA Guide – Cranes and Derricks in Construction
MENU
- Introduction
- Employer Responsibilities
- Section 1400 – Scope
- Section 1401 – Definitions
- Section 1402 – Ground Conditions
- Sections 1403-1406 – Assembly and Disassembly
- Sections 1407-1411 – Power Lines
- Section 1412 – Inspections (with Section 1435(f)-Tower Crane Inspections) and Section 1436(p)-Derricks Inspections)
- Section 1413 – Wire Rope Inspection
- Section 1414 – Wire Rope – Selection and Installation Criteria
- Sections 1415 Safety Devices & 1416 Operational Aids
- Section 1417 – Operation
- Section 1418 – Authority to Stop Operation
- Section 1419-1422 – Signals
- Section 1423 – Fall Protection
- Section 1424 – Work Area Control
- Section 1425 – Keeping Clear of the Load
- Section 1426 – Free Fall and Controlled Load Lowering
- Section 1427 – Operator Qualification and Certification
- Section 1428 – Signal Person Qualifications
- Section 1429 – Qualifications of Maintenance & Repair Employees
- Section 1430 – Training
- Section 1431 – Hoisting Personnel
- Section 1432 – Multiple-Crane/Derrick Lifts
- Section 1433 – Design, Construction and Testing
- Section 1434 – Equipment Modifications
- Section 1435 – Tower Cranes
- Section 1436 – Derricks
- Section 1437 – Floating Cranes/Derricks and Land Cranes/Derricks on Barges
- Section 1438 – Overhead & Gantry Cranes
- Section 1439 – Dedicated Pile Drivers
- Section 1440 – Sideboom Cranes
- Section 1441 – Equipment with a Rated Hoisting/Lifting Capacity of 2,000 Pounds or Less
- Directory of States with Approved Occupational Safety and Health Programs
- Workers’ Rights
- OSHA Assistance, Services and Programs
- OSHA Regional Offices
- NIOSH Health Hazard Evaluation Program
Section 1435 – Tower Cranes
Tower cranes present unique issues that are addressed in this section. In general, all provisions of the standard apply to tower cranes unless this section specifies different or additional requirements,
Additional Requirements for Erecting, Climbing and Dismantling
To reflect industry terminology, “erecting, climbing, and dismantling” are used instead of “assembly/disassembly” when referring to tower cranes. The following requirements apply in addition to those specified in sections 1403-1406:
- Tower crane foundations and structural supports (including both the portions of the structure used for support and the means of attachment) must be designed by the manufacturer or a registered professional engineer
- The Assembly/Disassembly (A/D) director must determine that tower crane foundations and structural supports are installed in accord with their design
- The A/D Director must address the backward stability of self-erecting cranes or cranes on traveling or static undercarriages
- Wind must not exceed the speed recommended by the manufacturer or, where the manufacturer does not specify this information, the speed determined by a qualified person
- Towers must be erected plumb to the manufacturer’s tolerance and verified by a qualified person. Where the manufacturer does not specify plumb tolerance, the crane tower must be plumb to a tolerance of at least 1:500 (approximately 1 inch in 40 feet)
- On job sites where more than one fixed jib (hammerhead) tower crane is installed, the cranes must be located such that no crane can come in contact with the structure of another crane. Cranes are permitted to pass over one another
- Prior to, and during, all climbing procedures (including inside climbing and top climbing), the employer must comply with all manufacturer prohibitions and have a registered professional engineer verify that the host structure is strong enough to sustain the forces imposed through the braces, brace anchorages, and supporting floors
- Equipment must not be erected, dismantled or operated without the amount and position of counterweight and/or ballast in place as specified by the manufacturer or a registered professional engineer familiar with the equipment. The maximum counterweight and/or ballast specified by the manufacturer or registered professional engineer must not be exceeded
- The size and location of signs installed on tower cranes must be in accord with manufacturer specifications. Where these are unavailable, a registered professional engineer familiar with the type of equipment involved must approve in writing the size and location of any signs.
Particular Caution Required When Using Synthetic Slings
This requirement appears in section 1404 but bears repeating here: when using synthetic slings during erecting, climbing, and dismantling, you must follow the synthetic sling manufacturer’s instructions, limitations, specifications and recommendations. Synthetic slings must be protected from abrasive, sharp or acute edges, and configurations that could cause a reduction of the sling’s rated capacity, such as distortion or localized compression.
Safety Devices
Different safety devices than those specified in section 1415 are required on tower cranes. Those required on tower cranes are:
- Boom stops on luffing boom type tower cranes
- Jib stops on luffing boom type tower cranes if equipped with a jib attachment
- Travel rail end stops at both ends of travel rail
- Travel rail clamps on all travel bogies
- Integrally mounted check valves on all load-supporting hydraulic cylinders
- Hydraulic system pressure limiting device
- The following brakes, which must automatically set in the event of pressure loss or power failure, are required:
- A hoist brake on all hoists
- Swing brake
- Trolley brake
- Rail travel brake
- Deadman control or forced neutral return control (hand) levers
- Emergency stop switch at the operator’s station
- Trolley end stops must be provided at both ends of travel of the trolley
Proper operation of these safety devices is required before operations can begin.
Operational Aids
Different operational aids than those specified in section 1416 are required for tower cranes. Those required on tower cranes are:
- Trolley travel limiting device at both trolley end stops
- Boom hoist limiting device that limits the range of the boom at the minimum and maximum radius
- Anti two-blocking device
- Hoist drum lower limiting device on tower cranes manufactured after November 8, 2011
- Load moment limiting device
- Hoist line pull limiting device
- Rail travel limiting device
- Boom hoist drum positive locking device and control
- Boom angle or hook radius indicator readable from the operator’s station. (Required on all luffing boom tower cranes and on hammerhead tower cranes manufactured after November 8, 2011)
- Trolley travel deceleration device
- Boom hoist deceleration device
- Load hoist deceleration device
- Wind speed indicator
- Load indicating device on tower cranes manufactured after November 8, 2011
As with operational aids on other equipment, tower cranes may be operated for limited amounts of time with malfunctioning aids as long as the temporary alternative measures specified in the standard are taken.
Inspections
Additional inspection requirements for tower cranes are discussed under section 1412 (Inspections).